3818 After Remodel


This is the completed 3818 home. The first to get a remodel February 2019.

New everything. New roof. New upgraded electrical service. New Exterior and interior paint, new HVAC.

New flooring tiles. Washer dryer, W/H, new kitchen and bath. Added a full bath to one of the 3 bedrooms.

New landscape in front yard. Gravel and river rock surround the home for drainage and look.

New 12’X16′ front covered porch and a special entry (really main) on the side that gave it that special look!